Submittal
Documentation — product data, shop drawings, samples — submitted to the architect or engineer for approval before equipment is ordered or installed.
Submittals prove what is being installed matches what was specified, and they are a schedule item with real lead time. A rejected submittal on long-lead equipment can move a project by months, which is why they go in early rather than when installation approaches.
They also protect the installer. An approved submittal showing an accepted substitution is the record that ends the later argument about whether a product was authorised.
Related terms
- Division 27 / 28
- The CSI MasterFormat sections covering low-voltage work: Division 27 is communications — cabling, AV, paging — and Division 28 is electronic safety and security, including access control and surveillance.
- Scope of Work
- The document defining exactly what is included, excluded, and assumed on a project — deliverables, quantities, responsibilities, and acceptance criteria.
- As-Built
- Documentation reflecting what was actually installed — final device locations, cable routes, labelling, IP addresses, and configuration — rather than what was originally drawn.
- Rough-In
- The construction phase where pathways, boxes, sleeves, and cable are installed before walls close, ahead of any device or equipment installation.
More Project Delivery terms
Support305 in the press
All press coverageNeed this specified correctly?
Our engineers will review your drawings or quote and tell you exactly where Submittal belongs in the design.
Talk to an engineer