A written, priced amendment to contracted scope, schedule, or cost — the formal mechanism for anything not in the original agreement.
Change orders are normal on construction projects; verbal ones are the problem. Written and approved before work proceeds, they protect both sides, and they capture schedule impact as well as cost — the part most often omitted and most often disputed later.
Frequent change orders usually indicate an under-specified scope rather than a difficult client. Investing in a detailed scope and a coordinated design is the cheapest way to reduce them.
Related terms
- Scope of Work
- The document defining exactly what is included, excluded, and assumed on a project — deliverables, quantities, responsibilities, and acceptance criteria.
- Punch List
- The itemised list of incomplete or defective work identified at walkthrough that must be corrected before final acceptance and payment.
- Submittal
- Documentation — product data, shop drawings, samples — submitted to the architect or engineer for approval before equipment is ordered or installed.
More Project Delivery terms
Support305 in the press
All press coverageNeed this specified correctly?
Our engineers will review your drawings or quote and tell you exactly where Change Order belongs in the design.
Talk to an engineer