A written, priced amendment to contracted scope, schedule, or cost — the formal mechanism for anything not in the original agreement.

Change orders are normal on construction projects; verbal ones are the problem. Written and approved before work proceeds, they protect both sides, and they capture schedule impact as well as cost — the part most often omitted and most often disputed later.

Frequent change orders usually indicate an under-specified scope rather than a difficult client. Investing in a detailed scope and a coordinated design is the cheapest way to reduce them.

Related terms

Scope of Work
The document defining exactly what is included, excluded, and assumed on a project — deliverables, quantities, responsibilities, and acceptance criteria.
Punch List
The itemised list of incomplete or defective work identified at walkthrough that must be corrected before final acceptance and payment.
Submittal
Documentation — product data, shop drawings, samples — submitted to the architect or engineer for approval before equipment is ordered or installed.

More Project Delivery terms

Support305 in the press

All press coverage

Need this specified correctly?

Our engineers will review your drawings or quote and tell you exactly where Change Order belongs in the design.

Talk to an engineer